PlanIQby Damith
Built by a planning engineer, for planners

Get more out of Primavera P6 in less time.

PlanIQ is an Excel add-in that reads your XER or P6 database and turns it into health checks, lookaheads, baseline variance and EVM curves — the analysis you'd otherwise rebuild by hand every update cycle - and, where you choose, writes progress and fixes back to a P6 database with a backup.

XER + P6 SQLiteExcel 64-bitWindows x64
01 · The tool

PlanIQ for Excel

Pick a source — an XER export or your P6 Professional database — and every tool works off the same data. Generic by design: no project-specific templates, no hardcoded codes.

Schedule Health Check

27 configurable checks with saved rule profiles: logic, lags and float, relationship types, resources and cost, constraints, dangling and out-of-sequence logic, calendars and invalid dates.

Guide →

Compare Schedules

Baseline against update across 21 change categories - added and deleted activities, dates, durations, float, critical path, calendars, constraints and relationships.

Guide →

OOS Scan and Solve OOS

Finds out-of-sequence logic in five cases, with the proof dates, then repairs it and re-tests the network.

Guide →

Delay Analysis

Window analysis between two updates, or a whole series: which activities slipped by their own duration and what it did to the finish.

Guide →

Look-Ahead

A 1 to 12 week look-ahead from the data date, by float band, with late starts and resource units per day.

Guide →

Progress Update

Writes progress from an Excel sheet into a P6 database - previewed first, written to a new copy or to the original after a backup.

Guide →

Split Revision

Splits in-progress activities at the data date into actual and remaining parts, with smart logic routing and a proof report, and writes a new XER.

Guide →

EVM and S-curve

Earned value from P6 (KPIs, Earned Schedule, EAC range, WBS roll-up, drivers, trend) and S-curves for cost, labour, non-labour and material.

Guide →

Float and Critical Path

Float bands and the critical and near-critical activities from the P6 database, in working days on each activity calendar.

Guide →

Gantt, WBS styling and reports

Colour and group by WBS level, build Gantt charts in Excel, WBS and activity-code charts, an activity tracker and a Power BI export.

Guide →

Resource control

Resource match, at-completion, assign, remove and solve resource issues in a P6 database, with preview and backup.

Guide →

Sheet utilities and AutoCAD progress

Paste visible only, split text, WBS to levels, field mapping and fix tools - plus reading an AutoCAD drawing and marking progress on it.

Guide →

Project Vault and database tools

Import and export XER, duplicate and delete projects, remove shared-user locks, reset a database password, clean and repair a P6 database.

Guide →

Update Manager

PlanIQ checks this site for new releases, shows what changed and installs the verified download. Check for Updates is in the Help group.

Guide →
02 · What's new

Latest PlanIQ release

The same feed the in-tool Update Manager reads. Install from here or from PlanIQ › Help › Check for Updates.

Loading release notes…

03 · Course

P6 From Zero to Professional

Series 1 · Primavera P6 fundamentals, Level 1–2 · 20 episodes, free on YouTube

One skill per video, all built on the same course project. Follow along and you finish with a complete schedule that is baselined, resource-loaded and updated.

  • EPS, calendars and a WBS set up the way live projects need them
  • Activities, relationships, constraints and the critical path after F9
  • Layouts, activity codes, roles and resource loading
  • Baselines, progress updates, XER exchange and printing

Level 1 · Foundations EP01–EP10

  1. EP01What is Primavera P6?L18–10 min
  2. EP02P6 Interface ExplainedL110–12 min
  3. EP03EPS and OBSL19–11 min
  4. EP04Creating a New ProjectL110–12 min
  5. EP05CalendarsL112–14 min
  6. EP06WBS – Work Breakdown StructureL111–13 min
  7. EP07ActivitiesL112–14 min
  8. EP08Activity IDsL18–10 min
  9. EP09Activity TypesL110–12 min
  10. EP10MilestonesL18–10 min

Level 2 · Scheduling and control EP11–EP20

  1. EP11RelationshipsL1–213–15 min
  2. EP12ConstraintsL211–13 min
  3. EP13Scheduling (F9) & Critical PathL214–16 min
  4. EP14Layouts, Filters & GroupingL212–14 min
  5. EP15Activity CodesL212–14 min
  6. EP16RolesL29–11 min
  7. EP17ResourcesL214–16 min
  8. EP18BaselinesL212–14 min
  9. EP19Updating a ScheduleL2–316–18 min
  10. EP20XER Export, Import & PrintingL211–13 min
04 · YouTube

Planning guides on YouTube

Practical videos on Primavera P6, planning and project controls, and using PlanIQ on real updates. Series 1 starts with the episodes below.

Subscribe on YouTube
PlanIQ by Damith Priyankara YouTube channel: Primavera P6, Planning, Project Controls
05 · About
Damith Priyankara

Damith Priyankara

Planning Engineer · Abu Dhabi, UAE

Scheduling & CPMDelay Analysis / EOTEVMProgress Reporting

PlanIQ is built by a planning engineer working with Primavera P6, delay analysis and EVM on construction projects in the UAE. Every feature started as a spreadsheet that got rebuilt one update cycle too many.

Help centre

Step-by-step guides for every PlanIQ window — the Help button in the tool lands here.

Open help →

Release notes

Every version, every change, with links to the guide for each new feature.

See updates →

Ready for your next update cycle?

Free to download. Works with your existing XER exports.

Download PlanIQ